What a Pellet Mill Quotation Includessix lines that are not the pellet mill, and what each one adds

A quotation prices a pellet mill, not a working site. Between the figure in the email and the day the first pellet comes out there are six lines that are usually outside it — spare parts, installation, trial material, freight, dies, and the electrical and steelwork. On a 100,000 build they add 15–25 %, and every one of them is cheaper to settle before the order than after it.

  • Six lines, 15–25 % on top of the pellet mill price
  • Freight and insurance run 6–12 % on their own
  • One die means one ratio, for one material
  • A calculator: what the build actually lands at

We quote landed, with the scope in writing · Six lines itemised, not a single number and a handshake

THE CRATE IS NOT THE SITEWooden export crates stacked in front of a wood pellet production line in a workshop
Export crates in front of a wood pellet production line. Everything inside those crates is on the quotation. The building, the floor, the cable, the crane that lifted them off the truck and the material for the first run are not — and on most builds those cost more than the crates did
Start here

The short answer

A quotation prices a pellet mill. Everything that turns it into a working site is a separate line.

Six things are usually outside a pellet mill quotation: spare parts beyond one set of rollers, installation beyond one engineer’s supervision, the material for the first run, freight past the port, a second die for a second material, and the electrical and steelwork that the annex happens to list or not. On a 100,000 build they add 15–25 %, and freight and duty are most of that. None of it is sharp practice — a factory quoting ex-works is quoting what it controls, and the rest depends on your port, your duty rate and your site. But it means two quotations cannot be compared on the headline figure, because the cheaper one is usually the one with less in it.

15–25 % on topOn a 100,000 build the six lines add 15,000–25,000. Freight, insurance and duty are more than half of that, and none of the three is on the pellet mill quotation.
One die, one ratioA pellet mill ships with one die plate in one compression ratio, cut for one material. A second material — or a second ratio to trial — is a second die at 400–1,200.
Supervision, not labourEngineer available for commissioning means one engineer, on site, telling your crew what to do. The flights, the visa, the hotel, the food and the local fitters are yours.
FOB ends at the portFree on board means the pellet mill is on the ship and the quotation has finished. Clearing, duty, inland haulage, unloading and the crane are after the full stop.

The percentages here are what the six lines have cost on builds we have shipped, as a share of the pellet mill price. Freight in particular moves with the route, the volume and the season, so treat the range as a planning figure and the forwarder’s quote as the number.

Six lines

What a quotation says, what it means, and what it adds

Read the second column against the third. The gap between them is the part of the price you find out about three months later.

Line What the quotation says What it actually means What it adds
Spare parts One set of spare rollers Rollers, not shells, not bearings, not belts. The parts that stop a pellet mill first are usually the ones the quotation does not name 3–6 % of the pellet mill price
Installation Engineer available for commissioning Supervision, not labour. One engineer, telling your crew what to do, with the flights, visa, hotel, food and local fitters on your side of the invoice 300–500 a day, plus travel
Trial material Test run before shipment Their material, their power, their report, at the factory. Your material on your site is a separate run, and it is the one that matters Free at the factory; 2–4 weeks of your time
Freight FOB, or CIF to your port To the port, not to your yard. Unloading, clearing, duty, inland haulage and a crane are all after the full stop 6–12 % of the pellet mill price
Dies One die included One plate, one compression ratio, cut for one material. A second material needs a second ratio, and a second ratio is a second die 400–1,200 a die
Electrical and steelwork Scope of supply, see annex The panel, the cable, the structure, the silo and the foundation bolts, in whatever combination the annex happens to list — and the annex is written by the seller 5–15 % of the pellet mill price

None of these is hidden, and none of them is unusual — every factory quotes the same way. What varies is how explicitly the quotation says so. A scope of supply with six named lines and a price against each is worth more than a cheaper number with a single line that says “complete”. The compression ratio chart is where the die line comes from, and the cost per tonne page is what starts after the quotation ends.

Four columns of sentences will not fit a phone. Swipe the table sideways for the cost column, or read the first and last, which are the two you came for.

The reason these six sit outside the price is not that anyone is hiding them. A Chinese factory quoting ex-works is quoting the part of the job it controls: the pellet mill, the die, the panel it builds, the crate. Freight depends on your port and the season, duty depends on your tariff code, installation depends on whether you have fitters, and the trial material depends on whether you send any. A seller who puts a number against all six is guessing, and the guess is either padded or wrong.

What that means in practice is that the headline figure is not comparable between two quotations until the scope is. A quotation at 100,000 with no spares, FOB and one die and a quotation at 112,000 with a first-year spares kit, CIF to your port and two dies are not 12,000 apart — they are the same price with different amounts in the crate. The way to compare them is to write the six lines down the side of a page and fill in both columns.

Two flat die pellet mills with spare rollers and die plates in plastic bags at their bases
Two pellet mills with their spare rollers and die plates bagged at the base. This is what “one set of spare rollers” looks like in the crate — and what it does not look like is bearings, belts, screens or a second die. Ask for the list, not the phrase
A grass pellet production line with conveyors installed inside a large steel-framed building
The same kind of build three months later: a shed, a floor, conveyors, cable and a crane that lifted everything into place. None of that was in the crate, and on a small build it is often the larger half of the money
Freight terms

FOB, CIF, DAP, DDP — who pays for what

The three letters after the price decide more of the landed cost than the price does. Most quotations are FOB, and most buyers read them as delivered.

Term What it covers What you still pay When it is the right one
EXW The pellet mill at our works, loaded on your truck Everything from our gate: export clearance, freight, insurance, duty Only if you already have a forwarder and a consolidation in China
FOB To the port of loading, cleared for export Ocean freight, insurance, duty, port charges at your end, inland haulage The most common term, and the one to convert every other quotation to before comparing
CIF Freight and insurance to your port Duty, port charges, clearing, inland haulage, unloading When you want one number to your port and will handle the rest yourself
DAP To your site, not unloaded Duty, and the unloading at your end When the site is inland and you would rather not arrange haulage from the port
DDP To your site, duty paid, unloaded Nothing on the invoice — because the duty is already inside the price Rarely. It hides the duty rate inside the pellet mill price, and you cannot reclaim what you cannot see

Convert every quotation to FOB before you compare them. It is the only term where the price is the equipment and nothing else, so it is the only one where two factories are quoting the same thing. The rest — freight, insurance, duty — you can price yourself in an afternoon with a forwarder, and doing so usually moves the ranking of the quotations.

Four columns will not fit a phone. Swipe the table sideways for the last column, which says which term to ask for.

DDP is the term buyers ask for and the term they should be wary of. It is convenient: one number, delivered, no clearing agent, no surprise at the port. But the duty is inside the price, which means you cannot see the tariff code it was calculated on, cannot reclaim it if your business structure allows that, and cannot tell whether the seller under-declared to make the number look better. On equipment that will be on your books for ten years, that is a lot of invisibility for the sake of one fewer email.

The term that costs buyers most is FOB read as delivered. Free on board means the pellet mill is on the ship and the quotation has finished — everything after that is yours, including the unloading at the destination port, which on a crate that weighs several t is a crane rather than a forklift. Budget 6–12 % of the pellet mill price for the freight and insurance, and another 2–5 % for the port, the clearing and the haulage inland.

The crate

What actually ships, and what to add to the order

A pellet mill arrives with one of most things. The list below is what to add while the crate is still open, because the second crate costs the same freight as the first.

Part In the crate Add to the order Why it matters
Die plate One, in the ratio for your material A second die A second material needs a second ratio, and a die bought later costs the same plus the freight
Rollers One set, fitted A second set Rollers wear at the same rate as the die, so the two come due in the same week
Roller shells Sometimes, as a spare A full set The shell is the wearing surface. Changing a roller without changing the shell wastes both
Bearings and seals One set Two sets Cheap, small, and the usual reason a pellet mill stops on a Sunday in a country with one supplier
V-belts One set Two sets The first thing to fail on a cold start and the last thing anyone puts on a quotation
Screens One, in the size for your grind Two more A screen is a consumable, and its hole size decides your particle size — you will want two sizes
Shear pins A handful A box They are designed to break. A pellet mill with no pins waits a week for a courier
Foundation bolts Yes, in the crate — They come with the crate. The foundation they go into does not, and it is yours to pour

The first-year kit — a second die, a second set of rollers and shells, two sets of bearings and belts, and a box of shear pins — is 8–15 % of the pellet mill price. Bought with the pellet mill it travels in the same crate and clears on the same documents; bought later it is a second shipment, a second clearing agent and, on a small site, two weeks of stopped production. The compression ratio chart is where the second die’s ratio comes from.

Four columns will not fit a phone. Swipe the table sideways for the reason column, or read the first two, which are what ships.

The item that causes the most trouble is the die. A pellet mill ships with one plate cut to one compression ratio, and that ratio is chosen for the material named in the order — sawdust at 1:5–1:7, straw at 1:8–1:10, rice husk at 1:9–1:12. If the site will run two materials, or if the buyer wants to trial two ratios, that is two dies, and a quotation that says “one die included” is telling the truth about a single-material site.

The rest of the list is about the second shipment. Every part above is small, cheap and made in the same factory — which means the cost of buying it later is not the part, it is the freight, the clearing and the wait. A box of shear pins that costs 40 to make costs 200 to send on its own, and the two weeks it takes to arrive is two weeks of a stopped pellet mill. That is the whole argument for a first-year kit, and it is why we quote one by default.

The calculator

What the build actually lands at

Six fields and no currency. Put in what your quotation leaves out and see what the pellet mill costs by the time it is standing on your floor.

121,000landed costthe figure to put in the plan
21.0% above the quoted pricethe part nobody mentions
21,000added by the six linesmoney, not percent
4,200a year over five yearsif you finance it that way

A pellet mill quoted at 100,000 lands at 121,000 — 21,000, or 21.0 %, above the figure in the email. Over five years that is 4,200 a year before the first tonne is made.

The six lines are the pellet mill price, freight and insurance, duty, port and haulage, installation and the first-year spares. Duty is calculated on the equipment value in most tariff schedules, not on the freight, which is why it is entered as a percentage here. Installation is supervision only — the local crew, the crane and the foundation are separate and are yours.

The figure that matters is the second one, the percentage. A quotation at 100,000 that lands at 121,000 is 21 % more than the number in the email, and on a build where the payback is calculated off the capital figure that is the difference between a two-year and a three-year return. The payback page takes the landed figure, not the quoted one.

Two of the six are worth arguing about and four are not. Freight and duty are what they are — a forwarder will price both in an afternoon, and no amount of negotiation with the factory moves them. Installation and the first-year spares are the two where a supplier can genuinely include something, and they are the two to put on the table before the price is agreed rather than after the crate has sailed.

Four steps

Reading a quotation backwards

Start at the annex and work up to the number. The order the quotation is written in is the reverse of the order you will pay for it.

01

Read the scope of supply before the price

One page, listing what is in the crate. If there is no scope of supply, the quotation is not a quotation — it is an indication, and the six lines above will all be yours.

02

Convert every quotation to FOB

Then compare. Freight, insurance and duty you can price yourself in an afternoon, and doing it usually changes which of the quotations is the cheaper one.

03

Price the first year of spares with the pellet mill

A second die, a second set of rollers and shells, two sets of bearings and belts, a box of pins. 8–15 % now, or a second shipment and two stopped weeks later.

04

Put installation in days, not in a phrase

Ask how many engineer-days, who pays the flights and the hotel, and who supplies the fitters. “Engineer available” is a phrase; “ten days, flights and hotel included” is a price.

The thing to hold on to is that a quotation is a scope, not a price. Two quotations with the same number and different annexes are different offers, and the one with the longer annex is almost always the cheaper one over the life of the site — not because the seller is generous, but because the things in the annex are the things you would have had to buy anyway, at retail, with freight, on a deadline.

The second thing is that the six lines are cheaper to settle before the order than after it. Freight consolidates, spares travel in the same crate, the die is cut at the same time as the first one, and installation can be priced as days rather than as a favour. Every one of them becomes a separate purchase, a separate shipment and a separate negotiation once the pellet mill has sailed — which is why the conversation to have is the one before the deposit, not the one after.

Three routes

Three ways to buy, and what each one leaves with you

Not three prices — three allocations of risk. Most first-time buyers choose the second one and wish they had chosen the first or the third.

  • Ex-works, and arrange everything yourself

    You get the lowest number on the page and the most work. Export clearance, freight, insurance, clearing, duty, haulage and unloading all become your afternoon. It is the right route if you already import regularly and have a forwarder who knows the route — and the wrong one for a first build, because the mistakes are expensive and they all arrive at the same port at the same time.

  • CIF to your port, then take over

    The middle route, and the common one. One number to your port, and you handle clearing, duty and the haulage inland. It is a reasonable split: the seller knows the export end, you know your own customs and your own roads. What it does not cover is the crane at the destination port, which on a crate of several t is not optional.

  • A landed price to the site

    One number, delivered, unloaded, with the installation days and the first-year spares itemised inside it. The most expensive on the page and the easiest to put in a business plan, because there is nothing left to discover. Ask for the six lines itemised anyway — a landed price with a single line is a landed price you cannot audit.

The order matters because the three routes are not three prices for the same thing. Ex-works is the equipment; CIF is the equipment and the sea; a landed price is the equipment, the sea, the customs, the road and the crane. A buyer comparing the three on the headline figure is comparing three different scopes — which is exactly the mistake this page exists to prevent.

Questions

What buyers ask about a quotation

Eight questions, answered the way we answer them on the phone.

What is usually not included in a pellet mill quotation?

Spare parts beyond one set of rollers, installation beyond one engineer’s supervision, the material for the first run, freight past the port, a second die, and the electrical and steelwork the annex happens to list. Together they add 15–25 % to a 100,000 build.

Is installation included in the price?

Usually as supervision, not as labour. One engineer attends, tells your crew what to do and signs the pellet mill off; the flights, visa, hotel, food and the local fitters are yours. Ask for the number of engineer-days in writing — it is the only way to price it.

What does FOB mean on a pellet mill quotation?

Free on board: the pellet mill is loaded on the ship at the port of loading and the quotation has finished. Ocean freight, insurance, duty, clearing, inland haulage and unloading are all yours. It is the term to convert every quotation to before comparing them.

How much does it cost to ship a pellet mill?

6–12 % of the pellet mill price for freight and insurance, and another 2–5 % for the port, the clearing and the haulage inland. A single flat die pellet mill on a pallet is at the bottom of that range; a full production line in several crates is at the top.

Do I need more than one die?

If the site will run more than one material, or if you want to trial two compression ratios, yes. A pellet mill ships with one plate cut for one ratio — 1:5–1:7 for wood, 1:8–1:10 for straw, 1:9–1:12 for rice husk. A second die is 400–1,200.

What spare parts should I order with the pellet mill?

The first-year kit: a second die, a second set of rollers and shells, two sets of bearings and V-belts, a second screen if there is a wood hammer mill in the build, and a box of shear pins. It is 8–15 % of the price and it travels in the same crate.

Should I ask for DDP?

Rarely. DDP is convenient but it hides the duty rate inside the pellet mill price, so you cannot see the tariff code it was calculated on and cannot reclaim it if your structure allows that. FOB or CIF with your own forwarder keeps the duty visible and usually cheaper.

How long does commissioning take?

Three to seven days for a single pellet mill and its panel; two to four weeks for a full production line with a biomass sawdust dryer, a pellet cooler and a pellet packing machine. The pellet mill runs in an hour — the rest of the time is the conveying, the electrical and the first material through it.

The quotation

Send your site address and we will quote it landed

With the six lines itemised, the scope of supply in writing and the engineer-days as a number. If you would rather have ex-works and handle the freight yourself, say so — we will quote both, and you can compare them on the same page.

Site
The nearest port and the nearest town to the site
Output capacity
The kg/h you need, and the material it has to make
Scope
Ex-works, CIF or landed — and what you already have on site
Power
The voltage and phase you have, and whether the panel is in scope

What happens after you send it

We reply with a scope of supply listing every line, a price against each of the six, the die ratio for your material, the engineer-days for commissioning and the first-year spares kit as a separate number — so the total is a figure you can put in a business plan rather than one you discover at the port.